Re: team combat penguin build diarys
right, got the motors mounted and 2 of the escs.

also go the lifter mounted and the polycarb blocks for the linac bolted to the base.
its far too big.
far, far too big.
right, got the motors mounted and 2 of the escs.

also go the lifter mounted and the polycarb blocks for the linac bolted to the base.
its far too big.
far, far too big.
Comment