Gravity
Wooohoooooo
Collecting parts for Gravity 5 is well underway now. Wheels/motors/gearboxes done, 2 co2 bottles done, 2 litre ali buffertank in the making, ram done, new 2.4Ghz radioset done...
still needed: 3 burkert valves and a speedcontroller
Then its just piling up the parts and weld a robot around it....
Wooohoooooo

Collecting parts for Gravity 5 is well underway now. Wheels/motors/gearboxes done, 2 co2 bottles done, 2 litre ali buffertank in the making, ram done, new 2.4Ghz radioset done...
still needed: 3 burkert valves and a speedcontroller

Then its just piling up the parts and weld a robot around it....